1. Define the project
Describe what will be removed, built, installed, occupied, or excavated. Include temporary activities and restoration. Identify the address, cross streets, purpose, responsible parties, and proposed construction sequence.
2. Identify the affected public right-of-way
Establish property lines, right-of-way limits, easements, and affected street features. Mark streets, alleys, sidewalks, curbs, gutters, parkways, and any above- or below-ground infrastructure. Confirm the jurisdiction; County, state, transit, or utility property can follow different processes.
3. Determine the likely permit path
Match the physical work to construction, excavation, encroachment, traffic-control, occupancy, or utility processes. One project can involve several approvals, and the order of coordination can matter. Use the services directory to organize likely topics without assuming a final permit determination.
4. Identify the agencies
The Bureau of Engineering, StreetsLA, LADOT, utility owners, and other agencies may have distinct roles. Identify the agency responsible for the underlying work and any departments responsible for traffic, trees, utilities, or other affected infrastructure.
5. Prepare the documentation
- Site plan or survey showing existing and proposed conditions
- Civil, structural, utility, or traffic-control plans when applicable
- Photos and a concise written scope
- Applicant, contractor, ownership, and professional information
- Related calculations, reports, approvals, and correspondence
6. Submit and coordinate
Follow the current instructions of the responsible agency. Keep forms, drawings, and related applications consistent. Track what was submitted, where it was submitted, and which version is under review.
7. Respond to review
Organize comments by sheet, topic, and agency. Revise the coordinated package rather than resolving one comment in isolation. If scope or field conditions change, confirm whether related reviews also need updates.
8. Complete applicable inspections or closeout
Before work, confirm applicable issuance conditions, contractor responsibilities, inspection steps, traffic measures, and utility coordination. During construction, keep approved documents available, document concealed work when appropriate, restore affected surfaces, address corrections, and retain completion records.
Questions to carry through the process
Does every project follow all eight steps in the same way?
No. This is an organizational framework. Actual requirements and sequence vary with the project, location, jurisdiction, and affected infrastructure.
Can an independent consultant approve a permit?
No. Only the responsible public agency can issue or approve its authorization. Independent assistance can help organize information and next steps.
Official starting points
Review the BOE permits page, BOE Permit Manual, StreetsLA, and LADOT as relevant to the work.
